Reaims: Integrating Formal Methods with the RE Process
This strand is principally concerned with investigating the use of formal methods (the B method) in the specification of railway signalling systems
and with integrating the work on viewpoints and human factors analysis with a requirements engineering process which includes the use of formal system
specification. Again, the process improvements will be tested on a real application from the railway signalling domain and quantitative information
collected.
« Back
Next »